Packaging: 25 kg bags made of 2 or 3 layers of kraft paper and 1 layer of polyethylene
Manufacturer: "Evro Construction" LLC.
Operating temperature: +5°C to +30°C.
Water-dry mixture ratio: 10-4 It liquid / 25-10 kg dry mixture
Density:
Specific feature:
Structure of matter:
Combustion-ignition rate:
Acid-alkaline coefficient:
Appearance:
Volume:
Specific weight:
Dry sediment:
Theoretical form of spending:
Temperature:
Minimum temperature:
Maximum temperature:
Maximum relative humidity:
Ideal atmosphere:
Adhesion resistance: >0.8 N/mm2
Slip resistance:
Waiting time after mixing: 3-5 minutes.
Intermediate filling time:
Bending resistance limit:
Compressive strength limit:
Usage thickness:
Hardening:
Second layer hardening:
It consists of a cement-based dry mixture rich in chemical additives and an acrylic emulsion-based liquid. Specific features:. It is resistant to chemicals and salts in the soil. Thanks to its high adhesion and elasticity, it is applied to the surface before gluing the facing tiles on plaster, floor plaster (scout) and other surfaces, creating a strong waterproofing layer. Areas of use: This insulating mixture is used in swimming pools, building foundations and balconies, main walls and partitions, reservoirs, terraces, before laying tiles and matlax in areas that are constantly in contact with water.Method of use: Carefully empty 25/10 kg of the powder mixture into the corresponding 10/4 liter of liquid mixture and mix until the bubbles disappear. Wait 3-5 minutes for the mixture to settle, stir again before starting to use. Apply 2 layers of the prepared mixture on the surface with a roller or brush, perpendicular to each other. Depending on the temperature between layers, you need to wait 5-6 hours. To prevent cracks from forming in the corners where the product is applied, ovalize the corners and reinforce the mixture with a net. The prepared mixture should be processed within 3 hours. Expired mixture should be discarded. Protect the surface on which the mixture is applied from sunlight, rain and dust for 48 hours and do not use it in places exposed to direct sunlight. Since it is applied as a thin film, cover with a protective coating material such as concrete or ceramic after application to surfaces subject to pedestrian and vehicle traffic. Places where the mixture is used, wait at least 1 week before putting it into use. The waterproofing mixture is applied to the surface in 2 layers. The consumption of the first layer is 1.2 kg/m2, the consumption of the second layer is 1.0 kg/m2.Storage conditions: The dry mixture can be stored in unopened bags, in dry conditions, on wooden pallets, stacking no more than 10 bags on top of each other, and the liquid mixture can be stored for 12 months if unopened.